AJ Walter Aviation
A tired old industrial unit with rusting metal sheets, a dull 70`s colour scheme and corroded fixings was our latest challenge.
The existing twin skin roofing and cladding system was removed back to the bare frame and a new upgraded twin skin system was installed.
The cladding was completed in a modern looking vibrant metallic silver to complement the occupiers industry.
This £200k contract was completed on time and on budget.